Differences
This shows you the differences between two versions of the page.
en:how_to_assign_temporary_schedule_to_an_employee [2017/05/30 16:06] 127.0.0.1 external edit |
en:how_to_assign_temporary_schedule_to_an_employee [2022/04/26 14:44] (current) peterk 2022/04/26 |
||
---|---|---|---|
Line 2: | Line 2: | ||
===== How to assign temporary schedule to an employee ===== | ===== How to assign temporary schedule to an employee ===== | ||
+ | |||
+ | <callout type="primary" icon="true"> | ||
BioStar 2 TA allows administrator to assign a schedule template to an employee on a temporary basis. The employee will remain on the schedule only for the time period selected. \\ \\ | BioStar 2 TA allows administrator to assign a schedule template to an employee on a temporary basis. The employee will remain on the schedule only for the time period selected. \\ \\ | ||
+ | </callout> | ||
=== Option 1 === | === Option 1 === | ||
Line 9: | Line 12: | ||
3. Select a user. \\ | 3. Select a user. \\ | ||
4. Left click on a day of the calendar. \\ | 4. Left click on a day of the calendar. \\ | ||
- | 5. Click Add Temporary Schedule. \\ | + | 5. Click **Add Temporary Schedule**. \\ |
{{:en:2x_sc_how_to_assign_a_temporary_schedule_001.png?nolink&700|}} | {{:en:2x_sc_how_to_assign_a_temporary_schedule_001.png?nolink&700|}} | ||